Tamarama Modular Sofa

Tamarama Modular Sofa Tamarama Modular Sofa
Tamarama Modular Sofa Tamarama Modular Sofa
20% off
New
5.0
Rated 5.0 out of 5 stars
5.0 Stars (21 Reviews)
Regular price $3,120
Regular price $3,900 Sale price $3,120
Save $780
Buy now pay later with
Shape: Curved
Configuration: Sofa
Size: 3 Sections

W270cm x D180cm x H93cm


Section Width: Regular

Colour: Forest Walk
Classic fabric
Luxe fabric

View full product details
  • 120 day trial
  • Fast & flexible delivery
  • 5-year warranty

Selling fast - order now to lock in delivery

Product description

Tamarama is an elevated icon, designed for timeless, all-day comfort. With modular flexibility, ultra-soft HyperCloud™ Foam, and washable covers, it’s style that stays with you.

Dimensions

Footprint width: 270 cm

Footprint depth: 180 cm

Height: 93 cm

Seat height: 52 cm

Seat depth (with back cushion): 64 cm

Seat depth (without back cushion): 84 cm

Weight: 124.5 kg

Materials, sustainability & care

Forest Walk, Bronzed Aussie, Winter Cream fabrics: Face: 100% Recycled Polyester, Backing: 100% Polyester

Aussie Latte, Frosty Grass, Pebble Beach fabrics: Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic, Backing: 100% Polyester

Frame: FSC® Certified Wood

Foam: Polyurethane Foam

Fill (Armrest Cushions/ Backrest Cushions / Seat inserts): Polyester Fibre & Polyurethane Foam

Legs: Polypropylene

Sustainability

  • FSC® Certified Wood
  • At least 20% Recycled Polyester in face fabrics

Country of Origin: Designed by Koala in Sydney, assembled in China.

Care

Fixed Frame, Arm & Lining Cushion Covers:

  • Do not remove lining covers for separate cleaning even though they have zippers.
  • Spot clean only with warm water & mild detergent mix.
  • Do not scrub with a stiff brush.
  • Use a clean cloth to blot out excess liquid.
  • Do not wet filling.
  • Allow to thoroughly dry before re-use.
  • Do not bleach.
  • Do not iron.
  • Do not dry clean.
  • Ensure removable covers are completely dry before fitting covers back on.

Removable Cover Care

  • Vacuum on low suction to remove dust and grit.
  • Give your cushions some love by regularly rotating them, changing their positions and plumping them up. This keeps them looking full and prevents "favourite spot" wear and tear.
  • Smooth & straighten covers: Take a moment to align hems, smooth out wrinkles, and adjust covers to keep the silhouette sharp.
  • Position your sofa away from direct sunlight to prevent fabric fading over time.

For spills & accidents:
- Act Fast: Blot spills immediately with a clean, dry cloth or paper towel.
- No Scrubbing: Avoid using stiff brushes or harsh chemicals, as these can damage the fabric fibres.

WARNING:

  • Keep furniture a safe distance away from open flames and strong sources of heat (e.g., heaters, fireplaces, radiators, wall or floor vents). If left too close this may create a fire hazard or damage furniture, including internal frames and other components.
  • Do not modify or change any components within this product without specific advice from Koala. This will void your warranty and may cause instability, damage or collapsing of the frame, resulting in injury.
  • Careless use of cigarettes and matches could set fire to this product.

CAUTION:

  • Do not stand or jump on seat cushions, backrests, or arms. This may cause instability, damage or collapsing of the frame, resulting in injury. This unit is designed for seating or sleeping use only.
  • Do not drag this furniture. Always lift the furniture from the base when moving. Dragging can break the legs or damage the frame integrity. Use two or more people to move this item to avoid injury.

Pilling can occur occasionally as a result of normal daily wear and should not be considered a fault. Please check the care labels on your sofa bed to see if a battery-operated pilling tool is suitable for the removal of fibre pills.

Delivery

We offer same day delivery on furniture and mattress orders in Sydney, Melbourne, Brisbane, Perth and Adelaide (for in-stock products). Delivery is FREE on mattresses and small items and our fast & flexible furniture delivery lets you choose a window that suits you.

Free metro delivery on any order with a mattress. Regional deliveries are charged per item.

Sydney, Melbourne, Brisbane and Perth Metro customers can also select premium delivery that includes assembly and rubbish removal on select items at an additional cost.

Box 1
Dimensions: W99 x D32 x H73cm
Boxed weight: 18kg

Box 2
Dimensions: W99 x D32 x H73cm
Boxed weight: 18kg

Box 3
Dimensions: W79 x D40 x H73cm
Boxed weight: 16kg

Box 4
Dimensions: W79 x D40 x H73cm
Boxed weight: 16kg

Box 5
Dimensions: W80 x D80 x H35cm
Boxed weight: 23kg

Box 6
Dimensions: W80 x D80 x H35cm
Boxed weight: 23kg

Box 7
Dimensions: W124 x D51 x H73cm
Boxed weight: 24kg

Box 8
Dimensions: W108 x D83 x H35cm
Boxed weight: 25kg

120 day trial

1. Give our products a 120 day trial; if they don’t suit you, we'll give you a full refund of the purchase price.
2. Returns are easy. In major metro areas we'll even pick up big items like mattresses, bed bases and sofas for free.

Learn more here.

Reviews

5.0 (21)

    Make it a set

    Product Features

    Thoughtful Details

    • Premium washable fabrics

      Splash resistant. Style forward.

    • Flexible modularity

      Moves when you do

    • Engineered support

      Sink into luxe comfort

    • Hands unzipping removable cream cushion cover on Koala sofa showing washable cover design
      Easy to change covers

      Change your look in seconds. Or years.

    • Child relaxing on sage green boucle Koala sofa with books and shag rug in living room
      Designed with the world in mind

      Mindfully made comfort

    • Woman relaxing on cream Koala sofa overhead portrait view in sunlit living room
      Get comfy in your own time

      120 day trial

    Take a closer look.

    Style that stays with you

    White Koala Tamworth sofa in bright coastal living room with ocean views, glass coffee table and bookshelf
    Camel Koala Tamworth modular sofa in corner configuration with pink cushion and Berber shaggy rug
    Light grey boucle Koala Tamworth sofa with chaise, Noguchi glass coffee table and paper lantern pendant

    All the pieces of style

    These are the building blocks to your style. Tamarama’s sofa, chaise and corner modules all let you shape it in a way that suits your space from the very start. Arrange it your way, expand it over time, and create a layout that matches your style.

    Your sofa starts here

    Start your style with Tamarama. It’s the foundation that anchors the room without locking you into one look. With relaxed curves, coastal silhouette and quietly confident presence, the ‘Tama’ brings an adaptable aesthetic to your home.

    Soft feels, stand out looks

    Your style doesn’t need to be fixed in place. With our Koala-exclusive range of fabrics and colours, your Tamarama can evolve and change over time. From cosy, premium demi-boucles, to smooth, velvety linen-look fabrics, we've got your style covered in 6 different colours.

    Slip into something fresh

    Style comes in so many different aesthetics. Sometimes they require a costume change. One year you’re minimal, the next you want your sofa to shine. Our water-resistant, washable and changeable covers make a fresh style as simple as possible

    Stand out with new shapes

    With Tamarama, you can stand out and make your own sofa statement. It’s as easy as flipping the chaise to the other side, or adding a new module (or two!). With true modularity your sofa style evolves in real time.

    Ready for every move

    From first apartment to forever home and every rental inbetween. Tamarama makes it easy to maintain and move your style with tool-free assembly and disassembly.

    Take a closer look

    Engineered comfort from every angle

    This video is decorative and does not convey additional information

    If you don't love it, we've got you covered

    Take it home, risk-free

    • Try it for 120-days

      Enjoy a 120 day trial at home to see if it’s the right fit for you and your space.

    • Smiling person holding a large brown cardboard box with "Koala" branding, standing indoors near white curtains and a glass door.

      Not for you? Return it.

      Contact our customer service team to arrange a return and receive a full refund.

    • Koala sofas in multiple colours lined up on warehouse floor during production

      We re-use or recycle

      Returned Koala products are refurbished, kept out of landfill, and given a new life through Koala Second Home.

    Customer reviews

    5.0
    Rated 5.0 out of 5 stars
    Based on 21 reviews
    100%would recommend these products
    Slide 1 selected
    21 reviews
    • Tabitha O.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 days ago
      Great couch

      So happy with my purchase, love my couch! Really comfy and looks great.

    • Amanda B.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      5 days ago
      Most comfortable lounge ever

      I recently purchased the Tamarama modular lounge in the cafe latter colour. It is the most comfortable lounge I ever owner and the fabric is so nice to touch and beautiful to look at.

    • Skye C.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      1 week ago
      Best couch I have ever owned

      Absolutely phenomenal!! 🤩

      It arrived in record time, was so easy to set up, and is now officially the most comfortable piece of furniture in the house! I might have to update the mattresses next! 😂

      The washable covers were what really sold me on the couch, but now I’m even more excited to come home after a big day and relax on it. It’s honestly become my favourite spot in the house! ❤️

    • Jade L.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      1 week ago
      love our Koala lounge

      Absolutely love our Koala lounge! It’s so comfortable and looks great in our space. Delivery was super quick, and we were kept updated with tracking the whole way. Couldn’t be happier! ❤️

    • Matthew R.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      1 week ago
      Great chair

      This is the most comfortable chair I have ever sat in. Buy it

    • Holly d. c.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      1 week ago
      Sofa that ticks all my boxes

      I looked for ages for a sofa that fit all of our requirements. My biggest bug bears with other sofas I looked at was the crappy fabric options (do not get a cheap white boucle for the love of god!) and the lack of back support. I

      Opted for this sofa for the deluxe fabric options and the fact that it was not only cushioned in a way that not many other sofas are, but also that old and young find this sofa supportive to the back and neck and like a big hug for your whole body.

      It’s worth the little bit more money for these things as I’m confident this will see us through many years.

      My only thing worth noting is that things can fall between the modular sections and are a bit hard to retrieve which does happen with young kids but I love the locking system that Koala have developed. It’s super easy to pull apart if you need to.

    • Karen L.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 weeks ago
      Perfect

      Beautiful all-round couch! Comfortable, perfect fit and has a solid feel that gives me confidence of quality. The whole family love it!

    • Bronwyn T.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 weeks ago
      Absolutely stunning couch!

      Easy to put together and oh so comfortable! Love the colour

    • Josh L.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 weeks ago
      The ultimate family couch

      After making do with an ikea couch for the past 5+ years we took the plunge on the Tama.. it’s another level of comfort, aesthetics and design. Plus the customer care team are incredible and responsive. We have kids and a dog, this is super durable and cleans easily A++

    • Liiane S.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 weeks ago
      Comfy like a cloud

      This cough 2 seater exceeded my expectations . Everyone fights to sit on it

      Love it

    FAQs about the Tamarama Modular Sofa

    How many configurations can I create with the Tamarama modular sofa?

    Can I add more modules later to upscale my sofa from, for example, a 2-seater to a 4 seater?

    How many throw cushions come with sofa?

    Can I switch the chaise or corner from the left side to the right side?

    How do I maintain the Tamarama modular sofa cushions?

    Can I remove the covers for the Tamarama modular sofa

    Are the sofa covers supposed to be wrinkled?

    Cosy home, and a healthy planet

    • Help us save the 
koala from extinction

    • Proud members
of 1% For The Planet

    • We’re a Certified 
B Corporation

    Tamarama Modular Sofa 3 Sections

    3 Sections
    Regular price $3,120
    Regular price $3,900 Sale price $3,120