Tamarama Modular Sofa

Tamarama Modular Sofa Tamarama Modular Sofa
Tamarama Modular Sofa Tamarama Modular Sofa
New
5.0
Rated 5.0 out of 5 stars
5.0 Stars (24 Reviews)
Regular price $7,100
Regular price Sale price $7,100
Save $-7,100
Shape: Curved
Configuration: Corner
Size: 6 Sections

W337cm x D337cm x H93cm


Section Width: Regular

Colour: Bronzed Aussie
Classic fabric
Luxe fabric

View full product details
  • 120 day trial
  • Fast & flexible delivery
  • 5-year warranty

Selling fast - order now to lock in delivery

Product description

The Tamarama is an elevated icon, designed for timeless, all-day comfort. With modular flexibility, ultra-soft HyperCloud™ Foam, and washable covers, it’s style that stays with you.

Dimensions

Footprint width: 337 cm

Footprint depth: 337 cm

Height: 93 cm

Seat height: 52 cm

Seat depth (with back cushion): 64 cm

Seat depth (without back cushion): 84 cm

Weight: 221 kg

Materials, sustainability & care

Forest Walk, Bronzed Aussie, Winter Cream fabrics: Face: 100% Recycled Polyester, Backing: 100% Polyester

Aussie Latte, Frosty Grass, Pebble Beach fabrics: Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic, Backing: 100% Polyester

Frame: FSC® Certified Wood

Foam: Polyurethane Foam

Fill (Armrest Cushions/ Backrest Cushions / Seat inserts): Polyester Fibre & Polyurethane Foam

Legs: Polypropylene

Sustainability

  • FSC® Certified Wood
  • At least 20% Recycled Polyester in face fabrics

Country of Origin: Designed by Koala in Sydney, assembled in China.

Care

Fixed Frame, Arm & Lining Cushion Covers:

  • Do not remove lining covers for separate cleaning even though they have zippers.
  • Spot clean only with warm water & mild detergent mix.
  • Do not scrub with a stiff brush.
  • Use a clean cloth to blot out excess liquid.
  • Do not wet filling.
  • Allow to thoroughly dry before re-use.
  • Do not bleach.
  • Do not iron.
  • Do not dry clean.
  • Ensure removable covers are completely dry before fitting covers back on.

Removable Cover Care

  • Vacuum on low suction to remove dust and grit.
  • Give your cushions some love by regularly rotating them, changing their positions and plumping them up. This keeps them looking full and prevents "favourite spot" wear and tear.
  • Smooth & straighten covers: Take a moment to align hems, smooth out wrinkles, and adjust covers to keep the silhouette sharp.
  • Position your sofa away from direct sunlight to prevent fabric fading over time.

For spills & accidents:
- Act Fast: Blot spills immediately with a clean, dry cloth or paper towel.
- No Scrubbing: Avoid using stiff brushes or harsh chemicals, as these can damage the fabric fibres.

WARNING:

  • Keep furniture a safe distance away from open flames and strong sources of heat (e.g., heaters, fireplaces, radiators, wall or floor vents). If left too close this may create a fire hazard or damage furniture, including internal frames and other components.
  • Do not modify or change any components within this product without specific advice from Koala. This will void your warranty and may cause instability, damage or collapsing of the frame, resulting in injury.
  • Careless use of cigarettes and matches could set fire to this product.

CAUTION:

  • Do not stand or jump on seat cushions, backrests, or arms. This may cause instability, damage or collapsing of the frame, resulting in injury. This unit is designed for seating or sleeping use only.
  • Do not drag this furniture. Always lift the furniture from the base when moving. Dragging can break the legs or damage the frame integrity. Use two or more people to move this item to avoid injury.

Pilling can occur occasionally as a result of normal daily wear and should not be considered a fault. Please check the care labels on your sofa bed to see if a battery-operated pilling tool is suitable for the removal of fibre pills.

Delivery

We offer same day delivery on furniture and mattress orders in Sydney, Melbourne, Brisbane, Perth and Adelaide (for in-stock products). Delivery is FREE on mattresses and small items and our fast & flexible furniture delivery lets you choose a window that suits you.

Free metro delivery on any order with a mattress. Regional deliveries are charged per item.

Sydney, Melbourne, Brisbane and Perth Metro customers can also select premium delivery that includes assembly and rubbish removal on select items at an additional cost.

Box 1
Dimensions: W99 x D32 x H73cm
Boxed weight: 18kg

Box 2
Dimensions: W99 x D32 x H73cm
Boxed weight: 18kg

Box 3
Dimensions: W79 x D40 x H73cm
Boxed weight: 16kg

Box 4
Dimensions: W79 x D40 x H73cm
Boxed weight: 16kg

Box 5
Dimensions: W79 x D40 x H73cm
Boxed weight: 16kg

Box 6
Dimensions: W79 x D40 x H73cm
Boxed weight: 16kg

Box 7
Dimensions: W80 x D80 x H35cm
Boxed weight: 23kg

Box 8
Dimensions: W80 x D80 x H35cm
Boxed weight: 23kg

Box 9
Dimensions: W80 x D80 x H35cm
Boxed weight: 23kg

Box 10
Dimensions: W80 x D80 x H35cm
Boxed weight: 23kg

Box 11
Dimensions: W124 x D51 x H73cm
Boxed weight: 24kg

Box 12
Dimensions: W108 x D83 x H35cm
Boxed weight: 25kg

Box 13
Dimensions: W124 x D51 x H73cm
Boxed weight: 24kg

Box 14
Dimensions: W108 x D83 x H35cm
Boxed weight: 25kg

120 day trial

1. Give our products a 120 day trial; if they don’t suit you, we'll give you a full refund of the purchase price.
2. Returns are easy. In major metro areas we'll even pick up big items like mattresses, bed bases and sofas for free.

Learn more here.

Reviews

5.0 (24)

    Make it a set

    Product Features

    Six reasons it’s worth it

    • Sink into luxe comfort
      Engineered support

      Sink into luxe comfort

    • Moves when you do
      Flexible modularity

      Moves when you do

    • Splash resistant. Style forward.
      Premium washable fabrics

      Splash resistant. Style forward.

    • Hands unzipping removable cream cushion cover on Koala sofa showing washable cover design
      Easy to change covers

      Change your look in seconds. Or years.

    • Child relaxing on sage green boucle Koala sofa with books and shag rug in living room
      Designed with the world in mind

      Mindfully made comfort

    • Woman relaxing on cream Koala sofa overhead portrait view in sunlit living room
      Get comfy in your own time

      120 day trial

    Take a closer look.

    Our softest sofa yet.

    White Koala Tamworth sofa in bright coastal living room with ocean views, glass coffee table and bookshelf
    Camel Koala Tamworth modular sofa in corner configuration with pink cushion and Berber shaggy rug
    Light grey boucle Koala Tamworth sofa with chaise, Noguchi glass coffee table and paper lantern pendant
    The cloud sofa, done right. – Curved

    The cloud sofa, done right.

    Deep, pillowy and relaxed, and comfortable in just about any room. This is the softest sofa Koala has made.

    Sink-in meets support.

    Tamarama is soft the moment you sit down, and provides proper support for longer lounging. Plush deep-fill cushions and cloud-soft HyperCloud™ foam make every seat the best one in the house.

    Quality in every layer.

    Quality in every layer.

    Solid FSC® certified wood frame. S-spring suspension that won't sag. Built from the inside out to stay supportive, and look sharp, for years.

    No fluffing required.

    Our cushions hold their shape through daily use, so Tamarama keeps looking its best without having to plump it after every sit.

    Stand out with new shapes

    With Tamarama, you can stand out and make your own sofa statement. It’s as easy as flipping the chaise to the other side, or adding a new module (or two!). With true modularity your sofa style evolves in real time.

    Tool-free assembly in minutes.

    Sofa, chaise, corner and curved modules connect with ease and come apart the same way. With tool-free assembly and endless modularity you can reconfigure, expand, or reposition your layout whenever you like.

    Take a closer look

    Engineered comfort from every angle

    This video is decorative and does not convey additional information

    If you don't love it, we've got you covered

    Take it home, risk-free

    • Try it for 120-days

      Try it for 120-days

      Enjoy a 120 day trial at home to see if it’s the right fit for you and your space.

    • Smiling person holding a large brown cardboard box with "Koala" branding, standing indoors near white curtains and a glass door.

      Not for you? Return it.

      Contact our customer service team to arrange a return and receive a full refund.

    • Koala sofas in multiple colours lined up on warehouse floor during production

      We re-use or recycle

      Returned Koala products are refurbished, kept out of landfill, and given a new life through Koala Second Home.

    Customer reviews

    5.0
    Rated 5.0 out of 5 stars
    Based on 24 reviews
    100%would recommend these products
    Slide 1 selected
    24 reviews
    • Sarah J. G.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      4 minutes ago
      Tamarama modular sofa component

      Components in extra wide were ordered to make our already large sofa larger and it is now the perfect size for the room!

    • Sarah J. G.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Section
      I recommend this product
      Rated 5 out of 5 stars
      5 minutes ago
      Tamarama modular sofa section

      We purchased the extra wide modular sofa section to compliment our sofa as we needed an extra large sofa for a large room and glad we did because the lounge would have been too small without it!

    • Valeria R.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 days ago
      Love my Tamarama Modular Sofa

      Amazing couch, beautiful colour and quality. SUPER easy to put together! would highly recommend!

    • Tabitha O.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      1 week ago
      Great couch

      So happy with my purchase, love my couch! Really comfy and looks great.

    • Amanda B.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      1 week ago
      Most comfortable lounge ever

      I recently purchased the Tamarama modular lounge in the cafe latter colour. It is the most comfortable lounge I ever owner and the fabric is so nice to touch and beautiful to look at.

    • Skye C.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 weeks ago
      Best couch I have ever owned

      Absolutely phenomenal!! 🤩

      It arrived in record time, was so easy to set up, and is now officially the most comfortable piece of furniture in the house! I might have to update the mattresses next! 😂

      The washable covers were what really sold me on the couch, but now I’m even more excited to come home after a big day and relax on it. It’s honestly become my favourite spot in the house! ❤️

    • Jade L.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      2 weeks ago
      love our Koala lounge

      Absolutely love our Koala lounge! It’s so comfortable and looks great in our space. Delivery was super quick, and we were kept updated with tracking the whole way. Couldn’t be happier! ❤️

    • Matthew R.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      3 weeks ago
      Great chair

      This is the most comfortable chair I have ever sat in. Buy it

    • Holly d. c.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      3 weeks ago
      Sofa that ticks all my boxes

      I looked for ages for a sofa that fit all of our requirements. My biggest bug bears with other sofas I looked at was the crappy fabric options (do not get a cheap white boucle for the love of god!) and the lack of back support. I

      Opted for this sofa for the deluxe fabric options and the fact that it was not only cushioned in a way that not many other sofas are, but also that old and young find this sofa supportive to the back and neck and like a big hug for your whole body.

      It’s worth the little bit more money for these things as I’m confident this will see us through many years.

      My only thing worth noting is that things can fall between the modular sections and are a bit hard to retrieve which does happen with young kids but I love the locking system that Koala have developed. It’s super easy to pull apart if you need to.

    • Karen L.
      Verified Buyer
      Reviewing
      Tamarama Modular Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      3 weeks ago
      Perfect

      Beautiful all-round couch! Comfortable, perfect fit and has a solid feel that gives me confidence of quality. The whole family love it!

    FAQs about the Tamarama Modular Sofa

    How many configurations can I create with the Tamarama modular sofa?

    Can I add more modules later to upscale my sofa from, for example, a 2-seater to a 4 seater?

    How many throw cushions come with sofa?

    Can I switch the chaise or corner from the left side to the right side?

    How do I maintain the Tamarama modular sofa cushions?

    Can I remove the covers for the Tamarama modular sofa

    Are the sofa covers supposed to be wrinkled?

    Cosy home, and a healthy planet

    • Help us save the 
koala from extinction

      Help us save the 
koala from extinction

    • Proud members
of 1% For The Planet

      Proud members
of 1% For The Planet

    • We’re a Certified 
B Corporation

      We’re a Certified 
B Corporation

    Tamarama Modular Sofa 6 Sections

    6 Sections
    Regular price $7,100
    Regular price Sale price $7,100